User:Ujdpje1635

From MediaWiki
Revision as of 17:07, 12 December 2013 by Ujdpje1635 (talk | contribs) (500 m long main road due to heavy rainfall occurs nine pit ()
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

500 m long main road due to heavy rainfall occurs nine pit (

'clock yesterday afternoon, the reporter saw at Sweetclover north, the road north to the south has two obvious collapse, the depth of the deepest pit of 2 m, a large number of broken asphalt below loess. TUNG from residents provided photographs of view, yesterday morning, a white van on the front wheel stuck in the pit. In addition to these two apparent collapse, there are many hidden dangers along the way,abercrombie outlet online, there are many places on the road has cracks and dents, a step on their feet, can feel the depression below the already empty, no cars in the community small car ran over these "traps" at any time "caught" as well. Nearby residents, from last year, following the road laid sewage pipelines, road repair completed last December. At that time when the paving, some relevant experience to remind residents of the construction workers, while laying the road to a certain thickness, it should be a real hit, so old paved thick, do not drop it once the road is certainly not strong, but construction workers have not been adopted opinion. After the last Beijing rainstorm, which highlighted the problem of the road, there were two vehicles stuck in a big hole on the road. On-site repair department is the section of the road the road to repair. According to the staff, the time to repair this road does not meet the requirements, then authorities repeatedly urge the construction unit, in the bottom layer of pavement laying, in order and material, does not oppose the use of loess, but each lay about 30 cm should be a real hit, and paved the uppermost surface must be used in accordance with specifications of the "five material", and now the question arises road construction unit apparently did not do as required. Now this road will be re-trimmed, because private cars are not street cleaning, so he chose to start from the sidewalk repair, and then the closure of roads to be completely refurbished. The construction will be used to meet the requirements of the "five material" requirements can be fully guaranteed, residents can rest assured. The whole project will last for a month. Text and photo</p>